top of page

Musgraves HQ Building

Year: 2006

Loads: Heating, Cooling

Emission systems:

Air handling Unit

Heat pump capacity (kw): 150

Collector:  12 no closed loop boreholes

​

About

The GSHP and AHU system is located in a roof level plantroom with boreholes located in the car park.

IMG_20240215_151518.jpg

©2024 by Orenco Energy LTD

+353 873 424 373

Clonmel, Co.Tipperary

bottom of page